.: New 500kv Transmission Line from Lenggang to Port
Dickson,Malaysia |
|
Date |
: |
May 2004 |
|
Location |
: |
Port Dickson , Malaysia
|
|
Summary |
: |
Airborne Laser Survey Works for New 500 kV
Transmission Line Project from Jimah Powerplant to
PMU Lenggeng, Negeri Sembilan. The project
deliverables including DTM/DEM and contours data of
45 km route length were delivered 9 days after the
airborne data acquisition commenced. |
|
|
.: Sabah East West Grid Interconnection Project |
|
Date |
: |
April 2002 |
|
Location |
: |
Sabah , Malaysia
|
|
Summary |
: |
A DVG-Helix survey was done between Kota Kinabalu
and Sandakan (275km) for the implementation of 275kv
and 132kv Transmission Line Project. Deliverables
included DTM, DEM, Digital Video Data and Digitized
features and Profiles in Optimal format.
|
|
|
.: EDF Pilot Project |
|
Date |
: |
1995 |
|
Location |
: |
France |
|
Summary |
: |
Test flight over a 10 km section of high voltage
electricity line with an additional production
corridor of 18 km completed upon approval of test
section results. Deliverables included one high
level video pass, 3 longitudinal profiles, DTM and
contour maps. |
|
|
.: Swan Lake Transmission Line |
|
Date |
: |
June, 1995 |
|
Location |
: |
Alaska, U.S.A
|
|
Summary
|
: |
Aerial survey of 65 mile transmission line between
Swan Lake and Tyee. |
|
|
.:Healy Transmission Line |
|
Date |
: |
1994 |
|
Location |
: |
Alaska, USA |
|
Summary |
: |
Healy to Fairbanks 230 KV intertie project which
consisted of 250 km of DVG HELIX profiling. |
|
|
.:Quebec Transmission Line |
|
Date |
: |
1994 |
|
Location |
: |
Quebec, Canada |
|
Summary |
: |
As built survey of existing powerline to determine
structural locations. |
|
|
.:Banff Powerline |
|
Date |
: |
1994 |
|
Location |
: |
Banff National Park , Alberta , Canada
|
|
Summary |
: |
Video survey of proposed transmission line
through a national park to assess environmental
impact.
|
|
|